Trimming the Overgrown Hedge Rows at a Vaughan Townhouse Complex

In late August 2026 the Goats Landscaping crew trimmed the hedge rows around a townhouse complex in Vaughan: long runs of hedge behind iron fencing along the public sidewalk, the hedge around a front gate, the hedges beside the buildings, and the planting along the railing of the underground parking ramp.

Project snapshot

Client
Townhouse complex
Location
Vaughan
Service
Hedge Trimming
Date
August 20–28, 2026

Scope of work

  • Hedge rows behind the iron fence along the public sidewalk
  • Hedge around the front gate
  • Hedges beside the buildings
  • Planting along the underground parking ramp railing
  • Cleanup and haul-away of every clipping
Townhouse complex hedge after trimming — flat, even and clear of the sidewalk Townhouse complex hedge before — overgrown and spilling over the sidewalk Before After
Front-gate hedge after trimming — shaped and cut back off the fence Front-gate hedge before — wild growth covering the fence and gate Before After

The challenge

By late summer the hedges around this Vaughan townhouse complex had outgrown their space. The long runs behind the iron fencing along the public sidewalk had pushed through the railings and out over the pavement, narrowing the walkway for residents and anyone passing by. At the front gate, the hedge had grown over the fence and onto the gate itself.

Beside the buildings the problem was quieter but just as real: the tops had widened and were shading the lower branches. Left like that, a hedge goes thin and bare at the bottom and takes years to fill back in. Along the underground parking ramp, planting was leaning out over the railing above the drive.

Our approach

Goats Landscaping treated the property as one job with several parts. The public sidewalk came first, because that is where overgrowth is most visible and where it gets in people's way. Then the gate, the building fronts, and last the parking ramp, which needed ladder work above the drive.

Every run got the same target: faces cut back to the fence line, tops squared, and each hedge kept slightly narrower at the top than at the base, so light reaches the lower branches and the hedge stays full from top to bottom.

What we did

  1. Cut the sidewalk hedge rows back to the iron fence line.
  2. Freed the front gate and fence from the hedge growing over them.
  3. Squared the tops beside the buildings, tapering each hedge narrower at the top.
  4. Worked from a ladder along the parking ramp so nothing hangs over the railing.
  5. Raked the clippings off the lawns and sidewalk as each section was finished.
  6. Loaded and hauled away every trimming.
Crew member trimming a tall hedge row behind the iron fence along the sidewalk
Crew member trimming a tall hedge row behind the iron fence along the sidewalk
Hedge along the underground parking ramp railing, with the ladder used for the high side
Hedge along the underground parking ramp railing, with the ladder used for the high side

The result

  • The public sidewalk is its full width again
  • The front gate opens freely
  • Straight, even hedge lines around the whole property
  • Light reaching the lower branches, so the hedges stay dense
  • No clippings left behind
Hedge row along the sidewalk after trimming, cut back to the fence line
Hedge row along the sidewalk after trimming, cut back to the fence line
Hedge beside a townhouse building after shaping
Hedge beside a townhouse building after shaping

Know-how from our crew

Good to know

Hedges like these stay dense with one main trim in late spring or early summer and a lighter one in mid to late summer. Avoid hard cutting late in the fall: new growth will not harden before frost.

How Goats Landscaping plans a hedge job on a complex

Before the first cut we walk the property with the manager and map every run: the public sidewalk, the gate, the building fronts and the parking ramp. The sidewalk side goes first, because that is where residents, visitors and the city notice overgrowth, and where it can block a walkway. Ladder work like the ramp railing is scheduled for the quietest time of day, and cleanup follows each section instead of waiting for the end of the day, so the property never looks half-finished.

Keeping a Vaughan complex looking this way

Hedges on a busy property look best on a schedule rather than when someone complains. For most townhouse complexes in Vaughan that means one main trim in late spring or early summer and a lighter pass in late summer. Goats Landscaping can build that into a season-long grounds plan together with lawn care, spring and fall cleanups and snow removal, so the board deals with one crew and one quote.

Common questions

How long does it take to trim the hedges on a townhouse complex?

It depends on how many metres of hedge there are, how tall they are and how overgrown. This Vaughan complex was done over several visits in late August 2026 because it covered sidewalk runs, a gate, building fronts and a parking ramp. Goats Landscaping gives a timeline with the quote.

Who is responsible for a hedge hanging over the public sidewalk?

Usually the property that owns the hedge. Cutting it back to the property's own fence line keeps the public walkway clear. Boulevard trees and plantings owned by the city are the city's responsibility.

Share this story